# ABB wins contract for process and power control system at Marathon Gold's Valentine Gold Project

Marathon Gold awarded ABB a contract to design and commission the integrated process and power control system for the Valentine Gold Project in Newfoundland and Labrador, Canada. The order was booked in Q3 2023, and the mine is scheduled for mill commissioning in Q4 2024 and first gold production in Q1 2025.

- Type: Contract
- Announced: 2023-10-09
- Where: Newfoundland and Labrador, Canada, Canada
- Status: announced
- Products: process control system, power control system, distributed control system
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [ABB](https://endata.com/companies/1547.md)
- [ABB](https://endata.com/companies/1547.md) (partner)
- [Intralox](https://endata.com/companies/39850.md) (partner)
- [CKF Systems](https://endata.com/companies/63015.md) (supplier)
- [Marathon Gold](https://endata.com/companies/65438.md) (customer)

## Sources

- [new.abb.com](https://new.abb.com/news/detail/108110/marathon-gold-selects-abb-as-integrated-process-and-power-automation-supplier-for-vital-valentine-gold-project), 2023-10-09: "Marathon Gold has agreed to a contract with ABB to design and commission the process and power control system for its Valentine Gold Project"
- [foodanddrinktechnology.com](https://www.foodanddrinktechnology.com/news/49666/ckf-starts-install-of-the-third-central-palletising-project-for-iconic-snack-manufacturer/), 2023-10-16: "We’re delighted that they have again chosen CKF Systems to help automate their operations and further drive their ambitions to increase productivity, streamline their operations and reduce manual handling through effective use of automation and robotics."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
