# Mitsubishi Power to supply second gas turbine to Grand River Energy Center

Mitsubishi Power and Grand River Dam Authority signed an agreement for a second M501JAC gas turbine for the Grand River Energy Center in Chouteau, Oklahoma. The unit will replace the last coal-fired unit and is expected to be operational by April 2026.

- Type: Contract
- Announced: 2023-10-02
- Where: Chouteau, Oklahoma, United States
- Status: announced
- Products: M501JAC gas turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [Grand River Dam Authority](https://endata.com/companies/24577.md) (customer)

## Sources

- [grda.com](https://grda.com/mitsubishi-power-selected-to-supply-second-advanced-class-gas-turbine-to-grand-river-energy-center/), 2023-10-04: "It will be the first M501JAC gas turbine to operate in simple cycle in the U.S., providing operational flexibility and fast start-up times to meet the needs of GRDA's evolving electricity grid."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
