# Collingwood water treatment plant expansion cost doubles to $270M

The expansion of the Raymond A. Barker Water Treatment Plant in Collingwood, Ontario, saw its lowest bid come in at approximately $270 million, nearly double the previous estimate of $121 million. The project will increase capacity from 32,000 to 59,000 cubic metres per day.

- Type: Expansion
- Announced: 2023-09-25
- Where: Collingwood, Ontario, Canada
- Value: $200.0M (270.0M CAD)
- Starts operating: 2028
- Status: announced
- Capacity: 59,000 cubic metres per day
- Products: water treatment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Town of Collingwood](https://endata.com/companies/72832.md)
- [Town of New Tecumseth](https://endata.com/companies/72833.md) (partner)

## Sources

- [esemag.com](https://esemag.com/water/collingwood-water-treatment-plant-cost-doubles/), 2023-09-25: "This is shocking news."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
