# STGT and TsVL to build gas turbine blade plant in Leningrad Oblast for RUB 6.4B

Sovremennye Tekhnologii Gazovykh Turbin (STGT) and Tsentr Vosstanovleniya Lopatok (TsVL) plan to build a plant in Villozskoye, Lomonosovsky District, Leningrad Oblast, for producing turbine blades and repairing gas turbine components. Investment is 6.4 billion rubles, creating 100 jobs, with completion by 2025.

- Type: New facility
- Announced: 2023-09-21
- Where: Villozskoye, Lomonosovsky District, Leningrad Oblast, Russia
- Value: $66.0M (6.40B RUB)
- Jobs: 100
- Starts operating: 2025
- Status: announced
- Capacity: repair 10 sets per year, produce 7 sets of new blades per year
- Products: gas turbine blades, turbine component repair
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Sovremennye Tekhnologii Gazovykh Turbin](https://endata.com/companies/65791.md)
- [Tsentr Vosstanovleniya Lopatok](https://endata.com/companies/72774.md) (partner)

## Sources

- [kommersant.ru](https://www.kommersant.ru/doc/6225863), 2023-09-21: "Планируемый объем инвестиций — 6,4 млрд рублей, Количество рабочих мест — 100. Срок реализации — 2025 год."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
