# WEG to supply electrical equipment for modular floating LNG liquefaction project

WEG is supplying gas turbine generators, compressor motors and soft-starters for a modular floating LNG liquefaction facility with 2.8 mtpa capacity, with the first unit slated to start in early 2023.

- Type: Contract
- Announced: 2022-07-15
- Where: Gulf of Mexico, United States
- Status: under construction
- Capacity: 2.8 mtpa LNG
- Products: gas turbine generators, compressor motors, soft-starters, LV motors
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [WEG](https://endata.com/companies/1550.md) (supplier)

## Sources

- [valve-world.net](https://valve-world.net/weg-to-supply-products-for-a-flagship-offshore/), 2022-07-15: "WEG has a key role in this new project development by supplying 12,150 kVA gas turbine generators."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
