# CS Wind to double capacity at Pueblo wind tower facility

CS Wind announced a 900,000-square-foot expansion of its Pueblo, Colorado wind tower production facility, aiming to double capacity to 10,000 tower sections per year by 2028. Ground was broken in April 2023.

- Type: Expansion
- Announced: 2023-09-08
- Where: Pueblo, Colorado, United States
- Starts operating: 2028
- Status: under construction
- Capacity: 10,000 wind tower sections per year
- Products: wind turbine towers
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [CS Wind](https://endata.com/companies/7243.md)

## Sources

- [pueblostarjournal.org](https://pueblostarjournal.org/news/2023/09/08/renewable-future-cs-wind-tower-production-facility-tour/), 2023-09-08: "President Biden set an ambitious dream for wind power in the United States."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
