# GE Vernova wins runner replacement contract from Manitoba Hydro

GE Vernova's Hydro Power business has been selected by Manitoba Hydro to replace the Unit 4 Kaplan runner at the 479 MW Grand Rapids Generating Station in Manitoba, Canada. The scope includes design, fabrication and delivery of a 6-meter-diameter runner.

- Type: Contract
- Announced: 2023-08-31
- Where: Grand Rapids Generating Station, Manitoba, Canada
- Status: announced
- Products: Kaplan runner for hydroelectric turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md) (supplier)
- [Manitoba Hydro](https://endata.com/companies/9921.md) (customer)

## Sources

- [renewableenergyworld.com](https://www.renewableenergyworld.com/hydro-power/manitoba-hydro-awards-ge-vernova-runner-replacement-contract/), 2023-08-31: "Canada has been a pioneer in hydropower development for about 140 years; the installed base today is significant, and ageing, which creates huge opportunities to service the fleet."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
