# Xinfengming starts production at 600,000-tonne fiber project phase I in Jiangsu

Xinfengming's wholly-owned subsidiary Jiangsu Xintuo started production at the first phase of its 600,000-tonne-per-annum differentiated functional fiber project in Xuzhou, Jiangsu, on August 19, 2023. The project uses advanced technology and equipment.

- Type: Expansion
- Announced: 2023-08-19
- Where: Xuzhou, Jiangsu, China
- Starts operating: 19 Aug 2023
- Status: completed
- Capacity: 600,000 tonnes per annum (total project); phase I capacity not specified
- Products: differentiated functional fiber
- Sectors: [Plastics and Polymers](https://endata.com/sectors/plastics-polymers.md), [Industrial Textiles](https://endata.com/sectors/industrial-textiles.md)

## Companies

- [Xinfengming Group](https://endata.com/companies/15176.md)
- [Xinfengming Jiangsu Xintuo New Materials Co., Ltd.](https://endata.com/companies/72142.md)

## Sources

- [beta.zhitongcaijing.com](http://beta.zhitongcaijing.com/content/detail/978622.html), 2023-08-21: "江苏新拓年产60万吨差别化功能性纤维项目一期已于2023年8月19日正式投产。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
