# Viking Engineering and Development triples production capacity with new facility in Blaine, Minnesota

Viking Engineering and Development moved into a new state-of-the-art facility in Blaine, Minnesota, tripling production capacity for its automated wood fastening equipment. The facility also includes a test lab for new product development.

- Type: Expansion
- Announced: 2023-08-11
- Where: Blaine, Minnesota, United States
- Status: completed
- Capacity: tripled production capacity
- Products: automated wood fastening equipment, bed-frame machines
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Viking Engineering and Development](https://endata.com/companies/72012.md)

## Sources

- [bedtimesmagazine.com](https://bedtimesmagazine.com/2023/08/viking-engineering-and-development-triples-production-capacity/), 2023-08-11: "As we have brought new products to market, we are strategically investing in operations to meet the demand of our bed-foundation and pallet-manufacturing customers worldwide."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
