# M.C. Dean completes Phase 3 expansion at Modular Mission Critical campus

M.C. Dean completed a 168,000-square-foot building at its Modular Mission Critical manufacturing campus in Caroline County, Virginia, marking the end of a five-year, $63 million Phase 3 expansion. The campus now totals over 500,000 square feet and has added more than 500 skilled jobs.

- Type: Expansion
- Announced: 2023-08-08
- Where: Ruther Glen, Virginia, United States
- Value: $63.0M
- Jobs: 500
- Starts operating: 8 Aug 2023
- Status: completed
- Capacity: 500,000 square feet
- Products: modular products for power, communications, security, life safety, mechanical, and automation systems
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [M.C. Dean, Inc.](https://endata.com/companies/38144.md)

## Sources

- [mcdean.com](https://www.mcdean.com/mcdean-phase-3-expansion-modular-mission-critical-press-release/), 2023-08-08: "Modular delivery is faster, higher quality, and safer, at equal or lower cost."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
