# Eaton wins $6M contract for South Lake Water Treatment Plant electrical infrastructure

Eaton won a $6 million contract to provide turnkey electrical engineering services and equipment for the new South Lake Water Treatment Plant in Georgetown, Texas, which is expected to be complete in 2026.

- Type: Contract
- Announced: 2023-08-03
- Where: Georgetown, Texas, United States
- Value: $6.00M
- Status: announced
- Capacity: 44 million gallons per day
- Products: power distribution equipment, control and protection equipment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Eaton](https://endata.com/companies/2829.md) (supplier)
- [City of Georgetown](https://endata.com/companies/63089.md) (customer)

## Sources

- [wateronline.com](https://www.wateronline.com/doc/eaton-wins-m-contract-to-supply-new-south-lake-water-treatment-plant-in-georgetown-texas-0001), 2023-08-03: "We’re applying our engineering expertise and market-leading power management solutions so the City of Georgetown can focus on its core mission for this project: delivering safe drinking water to the community."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
