# First Mode to build manufacturing facility for nuGen haulage solutions in Seattle

First Mode announced construction of its first manufacturing facility in Seattle, Washington, USA, to produce zero-emission powerplants and infrastructure for nuGen haulage solutions for mining and rail, with operations starting later in 2023.

- Type: New facility
- Announced: 2023-07-12
- Where: Seattle, Washington, United States
- Starts operating: 2023
- Status: under construction
- Capacity: 36 vehicles per year
- Products: zero-emission powerplants, hydrogen fuel cell solutions, battery solutions
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [First Mode](https://endata.com/companies/54501.md)

## Sources

- [firstmode.com](https://firstmode.com/updates/announcement-smart-manufacturing-facility/), 2023-07-13: "First Mode announced construction of its first manufacturing facility in Seattle, Washington, USA."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
