# NHK Spring to build ¥5 billion motor core production building at Atsugi plant

NHK Spring is building a new motor core production building at its Atsugi plant in Kanagawa, investing about ¥5 billion. Capacity at the plant will roughly triple after the building opens, with construction starting November 2022 and completion in October 2023.

- Type: Expansion
- Announced: 2022-05-26
- Where: Atsugi, Kanagawa, Japan
- Value: $39.0M (5.00B JPY)
- Status: announced
- Capacity: about three times current capacity at Atsugi plant
- Products: motor cores
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [NHK Spring](https://endata.com/companies/9282.md)

## Sources

- [kikai-news.net](https://kikai-news.net/2022/05/27/%e6%97%a5%e6%9c%ac%e7%99%ba%e6%9d%a1%ef%bc%88%e3%83%8b%e3%83%83%e3%83%91%e3%83%84%ef%bc%89%e3%80%81%e7%b4%8450%e5%84%84%e5%86%86%e6%8a%95%e3%81%98%e5%8e%9a%e6%9c%a8%e5%b7%a5%e5%a0%b4%e3%81%ab%e3%83%a2/), 2022-05-27: "神奈川県の厚木工場に、約50億円を投じて新しいモーターコアの生産棟を建設することにした。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
