# Micron to build $2.75B semiconductor assembly and test plant in Gujarat

Micron Technology will set up a semiconductor assembly and test facility in Gujarat, India, with a total investment of up to USD 2.75 billion. Phase 1 construction begins in 2023 and is expected to be operational in late 2024, creating up to 5,000 direct jobs.

- Type: New facility
- Announced: 2023-06-01
- Where: Gujarat, India
- Value: $2.75B
- Jobs: 5,000
- Starts operating: Dec 2024
- Status: announced
- Capacity: 500,000 square feet of planned cleanroom space (Phase 1)
- Products: DRAM, NAND, semiconductor assembly and test
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Micron Technology](https://endata.com/companies/16026.md)

## Sources

- [theprint.in](https://theprint.in/economy/micron-to-set-up-2-75-bn-semicon-test-assembly-plant-in-gujarat/1638025/), 2023-06-22: "Phased construction of the new assembly and test facility in Gujarat is expected to begin in 2023."
- [pib.gov.in](https://www.pib.gov.in/PressReleasePage.aspx?PRID=1983128&lang=8&reg=20), 2023-12-06: "Construction of the unit is going on in full swing and is expected to be completed in about 12 months."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
