# Vaillant Group Industrial to build heat pump component plant in Palárikovo, Slovakia

Vaillant Group Industrial plans to build a new production facility in Palárikovo, Slovakia, for manufacturing components for air-water heat pumps and spare parts. The investment is €130 million and will create 850 jobs. Construction is planned to start in August 2024, with completion by end of 2025 and operations beginning in March 2026.

- Type: New facility
- Announced: 2023-06-21
- Where: Palárikovo, Nové Zámky district, Slovakia
- Value: $141.7M (130.0M EUR)
- Jobs: 850
- Starts operating: Mar 2026
- Status: announced
- Products: components for air-water heat pumps, spare parts for heat pumps
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Vaillant Group Industrial](https://endata.com/companies/70975.md)

## Sources

- [teraz.sk](https://www.teraz.sk/ekonomika/priemysel-vaillant-group-industrial-pl/723028-clanok.html), 2023-06-21: "Spoločnosť Vaillant Group Industrial Palárikovo pripravuje výstavbu výrobného areálu v priemyselnom parku Veľké Čiky v Palárikove v okrese Nové Zámky."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
