# GE Grid Solutions wins contract for Neom green hydrogen substations

GE Grid Solutions was awarded a contract by Larsen & Toubro to supply 380 kV gas-insulated substations for the Neom green hydrogen project in Saudi Arabia. The project aims to produce 600 tonnes per day of carbon-free hydrogen by end of 2026.

- Type: Contract
- Announced: 2023-06-12
- Where: Oxagon, Neom, Saudi Arabia
- Status: announced
- Capacity: 600 tonnes per day of hydrogen
- Products: gas-insulated substations, switchgear
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Larsen & Toubro](https://endata.com/companies/263.md) (customer)
- [GE Grid Solutions](https://endata.com/companies/282.md) (supplier)

## Sources

- [guest.meed.com](https://guest.meed.com/ge-wins-neom-substation-deal/), 2023-06-12: "GE’s GIS and the 1.5 breaker configuration will help ensure uninterrupted operation at the hydrogen plant and the wind and photovoltaic plants, which will produce captive energy for the plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
