# GE to invest $50M in wind turbine production at Schenectady, New York

General Electric will spend $50 million to expand its Schenectady, New York operations, establishing an assembly line for 6.1 MW wind turbine nacelles. The expansion is expected to be completed by summer 2023, with production starting in fall 2023, creating about 200 jobs.

- Type: Expansion
- Announced: 2023-05-23
- Where: Schenectady, New York, United States
- Value: $50.0M
- Jobs: 200
- Starts operating: Q3 2023
- Status: announced
- Capacity: assembly line for 6.1 MW turbine nacelles
- Products: wind turbine nacelles
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [General Electric](https://endata.com/companies/1262.md)

## Sources

- [manufacturingdive.com](https://www.manufacturingdive.com/news/ge-vernova-plans-50-expansion-at-new-york-site/652037/), 2023-06-07: "We’re proud to expand our American manufacturing footprint and workforce to continue building and innovating energy technology that is cleaner, by bringing wind turbine component assembly — and an estimated 200 new jobs— to New York."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
