# SaskPower selects Black & Veatch and Graham Construction for gas turbine additions at two power stations

SaskPower awarded a contract to a joint venture of Black & Veatch and Graham Construction to add one simple cycle gas turbine each to the Ermine Power Station near Kerrobert and the Yellowhead Power Station near North Battleford in Saskatchewan, Canada.

- Type: Contract
- Announced: 2023-06-01
- Where: Kerrobert and North Battleford, Saskatchewan, Canada
- Status: announced
- Capacity: 92 MW (two 46MW turbines)
- Products: simple cycle gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Black & Veatch](https://endata.com/companies/293.md) (supplier)
- [SaskPower](https://endata.com/companies/27686.md) (customer)
- [Graham Construction](https://endata.com/companies/53500.md) (supplier)

## Sources

- [businesswire.com](https://www.businesswire.com/news/home/20230601005234/en/SaskPower-Selects-Black-Veatch-Graham-Construction-to-Add-New-Gas-Turbines-to-Two-Power-Stations), 2023-06-01: "SaskPower has selected Graham Black & Veatch, a joint venture between Black & Veatch’s construction entity in Canada, OCI, and Graham Construction, to complete the additions of one simple cycle gas turbine to the Ermine Power Station... and another to the Yellowhead Power Station."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
