# Baker Hughes wins TERNA contract for hydrogen-ready gas turbines and compressors in Greece

Baker Hughes was awarded a contract by TERNA, the construction arm of GEK TERNA Group, to supply three NovaLT12 hydrogen-ready gas turbines and three PCL compressors for a new compression station on the Greek gas transmission system. The station is expected to enter operation in 2024.

- Type: Contract
- Announced: 2022-04-01
- Where: Greece, Greece
- Status: announced
- Capacity: Compression station with up to 10% hydrogen transport capability
- Products: NovaLT12 hydrogen-ready gas turbines, PCL compressors
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [TERNA](https://endata.com/companies/8972.md) (customer)

## Sources

- [h2bulletin.com](https://h2bulletin.com/baker-hughes-provides-hydrogen-technology-in-greece-hysynergy-as-lighthouse-project/), 2022-04-01: "Baker Hughes has been awarded a contract by TERNA (the construction arm of GEK TERNA Group) to supply gas turbines and compressors that can run on a blend of natural gas and hydrogen."
- [finance.yahoo.com](https://finance.yahoo.com/news/baker-hughes-bkr-wins-contract-154803865.html), 2022-04-01: "Baker Hughes recently received a contract from TERNA to supply gas turbines and compressors capable of operating on a mixture of natural gas and hydrogen for a new compression station to serve the Greek domestic gas market."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
