# Baltica 2 SPV selects Siemens Gamesa for 107 offshore wind turbines

PGE and Orsted's offshore special purpose vehicle Baltica 2 signed a turbine supply agreement with Siemens Gamesa Renewable Energy for 107 turbines of 14 MW each (1,498 MW total). The contract includes design, production, supply, installation, launch and servicing, with realization planned between Q2 2023 and Q4 2027.

- Type: Contract
- Announced: 2023-04-20
- Where: Baltic Sea (Baltica 2 offshore wind farm), Poland
- Status: announced
- Capacity: 1,498 MW (107 turbines of 14 MW each)
- Products: offshore wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Orsted](https://endata.com/companies/2826.md) (customer)
- [Siemens Gamesa Renewable Energy](https://endata.com/companies/3169.md) (supplier)
- [PGE](https://endata.com/companies/22192.md) (customer)

## Sources

- [marketscreener.com](https://www.marketscreener.com/quote/stock/SIEMENS-GAMESA-RENEWABLE--111314240/news/PGE-and-Orsted-s-Offshore-SPV-Baltica-2-Picks-Siemens-Gamesa-Renewable-Energy-to-Provide-107-Turbine-43607998/), 2023-04-20: "PGE and Orsted's offshore SPV Baltica 2 picked Siemens Gamesa Renewable Energy to provide 107 turbines of combined capacity of 1,498 MW, PGE said in a market filing, citing contracts signed with Siemens."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
