# Kent awarded pre-FEED contract for BP and EnBW's Morven wind project

Engineering company Kent was awarded a pre-Front End Engineering Design (FEED) contract by BP and EnBW for the 2.9 GW Morven offshore wind project off Aberdeen, Scotland. The studies will last six months.

- Type: Contract
- Announced: 2023-04-18
- Where: off Aberdeen, Scotland, United Kingdom
- Status: announced
- Capacity: 2.9 GW
- Products: offshore wind farm, engineering design services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [BP](https://endata.com/companies/1131.md) (customer)
- [EnBW](https://endata.com/companies/6785.md) (customer)
- [Kent](https://endata.com/companies/64786.md) (supplier)

## Sources

- [enerdata.net](https://www.enerdata.net/publications/daily-energy-news/pre-feed-contract-awarded-29-gw-morven-wind-project-scotland-uk.html), 2023-04-18: "The FEED studies are expected to last six months and will involve engineering design work that supports key decisions, foundation type, corrosion protection concepts as well as transportation and installation feasibility."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
