# Sharp starts production at new AC plant in Indonesia

Sharp has completed construction of a new air conditioner factory in Karawang Industrial Park, Indonesia, and started production in early April 2023. The plant has an annual capacity of 900,000 units and represents an investment of approximately 4 billion yen.

- Type: New facility
- Announced: 2023-04-12
- Where: Karawang, West Java, Indonesia
- Value: $30.0M (4.00B JPY)
- Starts operating: Apr 2023
- Status: completed
- Capacity: 900,000 units/year
- Products: air conditioners, inverter air conditioners, Plasmacluster air conditioners
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Sharp](https://endata.com/companies/3595.md)
- [P.T. Sharp Electronics Indonesia](https://endata.com/companies/69690.md)

## Sources

- [corporate.jp.sharp](https://corporate.jp.sharp/news/230412-a.html), 2023-04-12: "インドネシアのエアコン新工場で生産・出荷を開始"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
