# TotalEnergies to install solar and storage at Holcim cement plant in Colorado

TotalEnergies will install and operate a 33-MW solar and 38.5-MWh energy storage system at Holcim's Portland cement factory in Florence, Colorado. The project is expected to begin operations in 2025.

- Type: Contract
- Announced: 2023-03-21
- Where: Florence, Colorado, United States
- Status: announced
- Capacity: 33 MW solar, 38.5 MWh storage
- Products: solar panels, energy storage system
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [TotalEnergies](https://endata.com/companies/9252.md) (supplier)
- [Holcim](https://endata.com/companies/15354.md) (customer)

## Sources

- [solarpowerworldonline.com](https://www.solarpowerworldonline.com/2023/03/totalenergies-to-install-solar-storage-project-at-colorado-cement-factory/), 2023-03-21: "This initiative with TotalEnergies demonstrates an ongoing determination to transform our operations and lower our carbon footprint."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
