# Vidrala ramps up largest glass furnace in Iberia after EUR 100 million investment

Vidrala Group refurbished and set in operation a highly electrified furnace at its Gallo Vidrio plant in Marinha Grande, Portugal, increasing capacity by over 50%.

- Type: Expansion
- Announced: 2023-03-16
- Where: Marinha Grande, Portugal, Portugal
- Value: $106.5M (100.0M EUR)
- Starts operating: 16 Mar 2023
- Status: completed
- Capacity: over 50% capacity increase
- Products: glass packaging, glass containers
- Sectors: [Packaging](https://endata.com/sectors/packaging.md)

## Companies

- [Vidrala](https://endata.com/companies/9211.md)

## Sources

- [vidrala.com](https://www.vidrala.com/en/press-room/news/vidrala-ramps-up-its-largest-glass-furnace-in-iberia-after-an-investment-of-almost-eur-100-million.html), 2023-03-15: "Vidrala Group has announced the refurbishment and setting in operation of one of its furnaces at the plant Gallo Vidrio, located in Marinha Grande, Portugal."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
