# Baker Hughes to supply hydrogen-ready gas turbines and compressors to TERNA for Greece

TERNA awarded Baker Hughes a contract to supply three NovaLT12 hydrogen-ready gas turbines and three PCL compressors for a new compression station on the Greek natural gas transmission system, expected to operate in 2024.

- Type: Contract
- Announced: 2022-03-01
- Where: Greece
- Status: announced
- Capacity: Three compression trains able to transport up to 10% hydrogen
- Products: NovaLT12 hydrogen-ready gas turbines, PCL compressors
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [TERNA](https://endata.com/companies/8972.md) (customer)

## Sources

- [gasprocessingnews.com](http://gasprocessingnews.com/news/2022/03/baker-hughes-to-provide-hydrogen-ready-turbo-compression-technology-for-pipeline/), 2022-03-01: "Baker Hughes has been awarded a contract by TERNA to supply gas turbines and compressors that can run on a blend of natural gas and hydrogen."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
