# AquaWorks to build water treatment plant in Daegu cluster

AquaWorks plans to invest 4.2 billion KRW to build a manufacturing plant on a 4,473㎡ site in the Daegu National Water Industry Cluster. Construction starts March 2023 and completes by September 2023.

- Type: New facility
- Announced: 2023-03-06
- Where: Daegu, South Korea, South Korea
- Value: $3.30M (4.20B KRW)
- Starts operating: Sep 2023
- Status: announced
- Products: water treatment equipment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [AquaWorks](https://endata.com/companies/68955.md)

## Sources

- [asiae.co.kr](https://www.asiae.co.kr/en/article/2023030614481865702), 2023-03-06: "AquaWorks plans to invest 4.2 billion KRW to build a manufacturing plant on a 4,473㎡ site within the National Water Industry Cluster."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
