# Keystone and GE install first commercial spiral-welded wind tower

Keystone Tower Systems and GE Renewable Energy installed the first commercial tapered spiral-welded wind tower with a 2.8 MW GE turbine, now fully operational.

- Type: Product launch
- Announced: 2023-02-21
- Where: Pampa, Texas, United States
- Status: completed
- Capacity: 1 GW of towers per year
- Products: spiral-welded wind tower
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Keystone Tower Systems](https://endata.com/companies/68686.md)
- [GE Renewable Energy](https://endata.com/companies/3506.md) (partner)

## Sources

- [nawindpower.com](https://nawindpower.com/keystone-ge-reach-milestone-for-unique-wind-turbine-tower), 2023-02-21: "This is the culmination of a dream we had to bring advanced manufacturing to the tower industry to help drive down the cost of wind energy and expand where wind is competitive into new regions."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
