# Triveni Turbines to increase capacity to 350 turbines annually by Q1 FY24

Triveni Turbines plans to raise its manufacturing capacity from 225 to 350 steam turbines per year, driven by demand growth. The expanded capacity will be operational by Q1 FY24.

- Type: Expansion
- Announced: 2023-02-20
- Where: India
- Starts operating: Q3 2023
- Status: announced
- Capacity: 350 turbines annually
- Products: steam turbines
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Triveni Turbines](https://endata.com/companies/64029.md)

## Sources

- [ndtvprofit.com](https://www.ndtvprofit.com/business/triveni-turbines-to-raise-capacity-to-350-turbines-annually-by-fy24-10828119), 2023-02-20: "Now, we will have a capacity to manufacture 350 turbines and that will be up and running by Q1 FY24."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
