# Haizea Bilbao to double Port of Bilbao factory and create 350 jobs

Haizea Bilbao will expand its Port of Bilbao plant by 48,800 square metres to over 100,000 square metres, creating about 350 direct jobs. Expansion work begins before summer 2022 to meet a contract with Ørsted.

- Type: Expansion
- Announced: 2022-02-09
- Where: Port of Bilbao, Spain
- Jobs: 350
- Status: announced
- Capacity: plant expanded to over 100,000 square metres
- Products: offshore wind components
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Haizea Bilbao](https://endata.com/companies/8908.md)

## Sources

- [haizeawindgroup.com](https://haizeawindgroup.com/en/haizea-bilbao-double-factory/), 2022-02-09: "Haizea Bilbao will expand its plant by 48,800 square metres to over 100,000 square metres and will generate some 350 direct jobs in the port of Bilbao."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
