# JSW Group to build green steel plant in Kadapa, Andhra Pradesh

JSW Group, in partnership with the Andhra Pradesh government, performed Bhoomi Puja for a new green steel plant in Kadapa. The plant will be built in two phases with an outlay of Rs 8,800 crore, with first phase capacity of 1 million tonnes per annum, to be commissioned in 24-30 months, creating 25,000 direct and indirect jobs.

- Type: New facility
- Announced: 2023-02-15
- Where: Sunnapurallapalle village, Kadapa, Andhra Pradesh, India
- Value: $1.06B (88.0B INR)
- Jobs: 25,000
- Starts operating: Aug 2025
- Status: announced
- Capacity: 1 million metric tonnes per annum (phase 1), 2 million metric tonnes per annum (phase 2)
- Products: green steel
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [JSW Group](https://endata.com/companies/29290.md)
- [Kadapa Steel Plant](https://endata.com/companies/68609.md) (target)

## Sources

- [newindianexpress.com](https://www.newindianexpress.com/states/andhra-pradesh/2023/Feb/16/fresh-impetus-for-kadapa-as-andhra-pradesh-cm-jagan-lays-stone-for-rs-8800-crore-steel-plant-2547843.html), 2023-02-16: "The 3D model green Steel Plant will be constructed with an outlay of Rs 8,800 crore in two phases."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
