# Krasnoyarsk CHPP-3 prepares to accept generator for second power unit

Krasnoyarsk CHPP-3 is constructing a second power unit with a 220 MW generator manufactured by Novosibirsk ELSIB plant. The project, costing 27.5 billion rubles, is scheduled for commissioning at the end of 2024.

- Type: Expansion
- Announced: 2023-01-24
- Where: Krasnoyarsk, Russia
- Starts operating: 2024
- Status: under construction
- Capacity: 185 MW electrical, 270 Gcal thermal
- Products: power unit, turbine generator, steam turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Krasnoyarsk CHPP-3](https://endata.com/companies/68054.md)
- [Ural Turbine Plant](https://endata.com/companies/25403.md) (supplier)
- [Novosibirsk ELSIB](https://endata.com/companies/68055.md) (supplier)

## Sources

- [investkrsk.ru](https://investkrsk.ru/en/news/22), 2023-01-24: "The commissioning of the second power unit with a capacity of 185 MW and a thermal capacity of 270 Gcal is scheduled for the end of 2024."

---