# Osstem Implant builds second plant in Busan, South Korea

Osstem Implant is building a second plant in Busan's Seokdae Advanced Industrial Complex, with a total floor area of 13,700 m². The plant will produce 13 million implant sets annually, raising total capacity to 30 million sets. Mass production is targeted for the second half of 2023.

- Type: Expansion
- Announced: 2023-01-14
- Where: Busan, Haeundae-gu, South Korea
- Starts operating: Q3 2023
- Status: under construction
- Capacity: 13 million implant sets per year (new); total 30 million sets
- Products: dental implants
- Sectors: [Medical Devices](https://endata.com/sectors/medical-devices.md)

## Companies

- [Osstem Implant](https://endata.com/companies/67871.md)

## Sources

- [medipana.com](https://www.medipana.com/news/articleView.html?idxno=307243), 2023-01-13: "설비 구축과 행정 절차 등을 진행해 올해 하반기부터 2공장에서도 본격적으로 제품을 양산하는 게 목표"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
