# Adaro Group plans expansion of aluminum smelter and power plant in Indonesia

PT Adaro Energy Indonesia Tbk is planning an expansion of its aluminum smelter and power plant in Kalimantan Industrial Park, North Kalimantan. The smelter, owned by subsidiary PT Kalimantan Aluminium Industry, will have an annual capacity of 2 million tons. Construction is expected to take 24 months.

- Type: Expansion
- Announced: 2022-12-29
- Where: Kalimantan Industrial Park, Bulungan, North Kalimantan, Indonesia
- Status: announced
- Capacity: 2 million tons per year
- Products: aluminum
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Adaro Energy Indonesia](https://endata.com/companies/67577.md)
- [PT Kalimantan Aluminium Industry](https://endata.com/companies/67578.md)
- [PT Kaltara Power Indonesia](https://endata.com/companies/67579.md)

## Sources

- [aluminum.yieh.com](http://aluminum.yieh.com/en/indonesias-adaro-group-planning-expansion-for-aluminum-smelter-power-plant/138596), 2022-12-29: "PT Adaro Energy Indonesia Tbk, a leading coal mining company in Indonesia, is planning an expansion project for an aluminum smelter and power plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
