# EnergoTechService to invest RUB 2B in power plant factory expansion

EnergoTechService will invest RUB 2 billion in the second phase of its Tyumen energy equipment plant in Borovsky Industrial Park, expanding the assembly shop from 1,250 m² to 2,300 m² and adding a logistics center and administrative building, with commissioning planned for Q3 2025.

- Type: Expansion
- Announced: 2022-12-27
- Where: Borovsky Industrial Park, Tyumen, Russia
- Value: $28.0M (2.00B RUB)
- Starts operating: Q3 2025
- Status: announced
- Products: modular gas piston power plants, gas turbine power plants, diesel power plants
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [EnergoTechService](https://endata.com/companies/65428.md)

## Sources

- [t.rbc.ru](https://t.rbc.ru/tyumen/27/12/2022/63aab4829a79472c0b6fc4c4), 2022-12-27: "«Предполагается увеличить размеры сборочного цеха, а также построить два новых здания — логистический распределительный комплекс и административно-бытовой корпус», – цитирует компанию издание «Деловой квартал»."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
