# Sandvik wins SEK 400 million AutoMine order from Codelco at El Teniente

Sandvik Mining and Rock Solutions received orders worth SEK 400 million from Chilean miner Codelco for AutoMine load and haul automation and connected equipment for the El Teniente mine. The contract runs from 2022 through 2027.

- Type: Contract
- Announced: 2022-01-01
- Where: El Teniente mine, Chile
- Value: $44.0M (400.0M SEK)
- Status: announced
- Capacity: automation scalable to up to 32 machines
- Products: AutoMine load and haul automation, Toro TH663i trucks, Sandvik LH514 loaders, AutoMine Fleet system
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [Sandvik](https://endata.com/companies/6190.md) (supplier)
- [Codelco](https://endata.com/companies/8745.md) (customer)

## Sources

- [home.sandvik](https://www.home.sandvik/en/news-and-media/news/2022/01/sandvik-receives-record-order-for-automine-solutions/), 2022-01-01: "Sandvik Mining and Rock Solutions has received a major order for the AutoMine® load and haul automation system valued at about SEK 250 million from the Chilean mining company Codelco"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
