# Forth Electrical Services appointed to build £3.1M energy network in Glasgow

Forth Electrical Services (FES) has been appointed by Clyde Gateway to construct a low temperature district heating and cooling network in Glasgow, Scotland, in a £3.1 million project. The network will use heat pump technology and renewable energy to supply businesses in the Clyde Gateway district.

- Type: Contract
- Announced: 2022-12-20
- Where: Glasgow, Scotland, United Kingdom
- Value: $3.75M (3.10M GBP)
- Status: announced
- Products: low temperature district heating and cooling network, heat pump technology, solar energy, battery storage
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Forth Electrical Services](https://endata.com/companies/67439.md)
- [Clyde Gateway](https://endata.com/companies/67440.md) (customer)

## Sources

- [projectscot.com](https://projectscot.com/2022/12/firm-appointed-to-build-3-1m-low-temperature-energy-network-in-glasgow/), 2022-12-20: "Forth Electrical Services (FES) has been appointed by Clyde Gateway to construct a low temperature energy network in a £3.1 million project."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
