# Sumitomo Heavy Industries wins order for biomass boiler from Tosoh

Sumitomo Heavy Industries secured an EPC contract from Tosoh Corporation for a 74 MW-class wood biomass and recycled fuel-fired CFB boiler at Tosoh's Nanyo Complex in Shunan City, Japan. The boiler is scheduled to start up in 2026.

- Type: Contract
- Announced: 2022-12-05
- Where: Shunan City, Yamaguchi Prefecture, Japan
- Status: announced
- Capacity: 74 MW
- Products: wood biomass and recycled fuel-fired boiler, circulating fluidized bed boiler
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Sumitomo Heavy Industries](https://endata.com/companies/1271.md)
- [Tosoh](https://endata.com/companies/19811.md) (customer)

## Sources

- [shi.co.jp](https://www.shi.co.jp/english/info/2022/6kgpsq0000003by1.html), 2022-12-06: "SHI secured an order from Tosoh Corporation for a 74 MW-class wood biomass and recycled fuel-fired boiler."
- [marketscreener.com](https://www.marketscreener.com/quote/stock/SUMITOMO-HEAVY-INDUSTRIES-6491272/news/Sumitomo-Heavy-Industries-SHI-Secures-Order-for-a-74-MW-Class-Wood-Biomass-and-Recycled-Fuel-Fired-42482135/), 2022-12-06: "Sumitomo Heavy Industries, Ltd. secured an order from Tosoh Corporation for a 74 MW-class wood biomass and recycled fuel-fired boiler based on the EPC contract."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
