# Mehler Engineered Products builds new hybrid finishing line at Hessisch Lichtenau plant

Mehler Engineered Products began construction in October 2021 on a new production hall with a hybrid finishing line for technical threads at its German plant in Hessisch Lichtenau. Trial operation is scheduled to start in April 2023.

- Type: Expansion
- Announced: 2022-12-02
- Where: Hessisch Lichtenau, Germany
- Starts operating: Apr 2023
- Status: under construction
- Products: technical threads
- Sectors: [Industrial Textiles](https://endata.com/sectors/industrial-textiles.md)

## Companies

- [MEHLER Engineered Products GmbH](https://endata.com/companies/56890.md)

## Sources

- [mehler-ep.com](https://mehler-ep.com/construction-activities-of-the-hybrid-equipment-plant-hessisch-lichtenau/), 2022-12-02: "The first trial operation will start after final commissioning of the plant in April 2023."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
