# Battolyser Systems to build electrolyser gigafactory in Rotterdam port

Battolyser Systems will build a new electrolyser gigafactory in the port of Rotterdam, occupying 14,000 m² in the M4H area. The investment is around EUR 100 million, creating over 700 jobs, with capacity up to 1 GW per year. Final investment decision expected in 2023, operation in 2024.

- Type: New facility
- Announced: 2022-11-29
- Where: Rotterdam port, M4H industrial area, Netherlands
- Value: $104.0M (100.0M EUR)
- Jobs: 700
- Starts operating: 2024
- Status: announced
- Capacity: 1 GW per year
- Products: electrolyser systems, Battolyser (integrated battery and electrolyser)
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Battolyser Systems](https://endata.com/companies/66930.md)

## Sources

- [hydronews.it](https://www.hydronews.it/en/lolandese-battolyser-systems-builds-its-first-gigafactory-of-electrolysers-at-the-port-of-rotterdam/), 2022-11-29: "The new production plant will occupy an area of 14,000 square metres in the M4H industrial area, in the heart of the Dutch port - one of the world's major trading ports - and will require an investment of around EUR 100 million, creating more than 700 new direct jobs."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
