# Griffner Metallveredelung expands capacity at Werk 2 in Griffen, Austria

Griffner Metallveredelung is completing assembly work at its Werk 2 in Griffen, Austria, to increase capacity and quality. The expansion includes a new hall, automated conveyor technology, a powder coating line, and biomass boiler, with completion expected in early 2023.

- Type: Expansion
- Announced: 2022-11-29
- Where: Griffen, Austria
- Starts operating: Q1 2023
- Status: under construction
- Products: powder coating, metal finishing services
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Griffner Metallveredelung](https://endata.com/companies/66921.md)

## Sources

- [gmv.at](https://www.gmv.at/griffner-pulverbeschichtung-projekt-werk-2/), 2022-11-29: "Nach Fertigstellung des Werks, welche für Anfang 2023 geplant ist, wird uns dies die Möglichkeit bieten unsere Kapazität zu erhöhen und im Besonderen die Qualität unserer Dienstleistung in hohem Maße weiter steigern und spezialisieren zu können."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
