# GE selects Mammoet for heavy lifting at Dogger Bank Wind Farm

GE Renewable Energy selected Mammoet UK to supply onshore heavy lifting and transport for staging and assembly of 277 sets of turbine components for the Dogger Bank Wind Farm at Able Seaton Port.

- Type: Contract
- Announced: 2022-11-21
- Where: Teesside, UK (Able Seaton Port), United Kingdom
- Status: announced
- Capacity: 277 sets of blades, nacelles, and towers
- Products: Haliade-X wind turbines, heavy lifting and transport services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Renewable Energy](https://endata.com/companies/3506.md) (customer)
- [Mammoet UK](https://endata.com/companies/66781.md) (supplier)

## Sources

- [gevernova.com](https://www.gevernova.com/news/press-releases/ge-renewable-energy-selects-mammoet-to-supply-onshore-heavy-lifting-and-transport-dogger-bank-wind-farm), 2022-11-21: "We are delighted to announce that we have selected Mammoet UK as our cranes and logistics supplier for the Dogger Bank Wind Farm."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
