# ZiO Group ships boiler equipment for Vladivostok TPP-2 modernization

ZiO Group of Companies, under a contract with PJSC RusHydro, shipped over 750 tons of boiler equipment for the reconstruction of Vladivostok TPP-2. The project includes three new boiler units and will increase the plant's electric capacity to 574 MW and thermal capacity to 1,115 Gcal/h.

- Type: Contract
- Announced: 2022-11-16
- Where: Vladivostok, Primorye, Russia
- Status: under construction
- Capacity: 3 boiler units of E-540-13.8-560GM type, each 540 tons of steam/hour
- Products: boiler equipment, boiler units
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ZiO Group of Companies](https://endata.com/companies/66673.md)
- [PJSC RusHydro](https://endata.com/companies/66674.md) (customer)
- [Machine-Building Factory of Podolsk](https://endata.com/companies/66675.md) (supplier)

## Sources

- [en.podolskmash.ru](https://en.podolskmash.ru/n150), 2022-11-16: "ZiO Group of Companies, in accordance with the contract signed with PJSC RusHydro, manufactures 3 boiler units of E-540-13.8-560GM type for Vladivostok TPP-2."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
