# Linxon secures framework agreement for ESB substations in Ireland

Linxon has secured a framework agreement with ESB for the design and build of high-voltage electrical substations in the Republic of Ireland, running from 2022 to 2025 with optional extension to 2029.

- Type: Contract
- Announced: 2022-11-15
- Where: Ireland
- Status: announced
- Products: high-voltage electrical substations, GIS/AIS switchgears, control systems
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Linxon](https://endata.com/companies/8683.md)
- [ESB](https://endata.com/companies/44578.md) (customer)

## Sources

- [news.cision.com](https://news.cision.com/linxon/r/linxon-secures-framework-agreement-for-esb--republic-of-ireland,c3667092), 2022-11-15: "We are delighted to have been selected by the ESB to enter into a long-term relationship and secure our place on this exciting Design and Build of HV substation framework."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
