# Comau to build battery module production lines for ACC gigafactory

Comau has been selected by Automotive Cells Company (ACC) to design and develop a highly integrated battery module production line for its future Gigafactory in Billy-Bercalu Douvrain, France, with capacity to produce up to 8 GWh annually by end of 2024.

- Type: Contract
- Announced: 2022-10-08
- Where: Billy-Bercalu Douvrain, north of France, France
- Status: announced
- Capacity: 8 GWh annually
- Products: battery module production lines, EV batteries
- Sectors: [Automation and Robotics](https://endata.com/sectors/automation-robotics.md), [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Comau](https://endata.com/companies/17266.md) (supplier)
- [Automotive Cells Company](https://endata.com/companies/57927.md) (customer)

## Sources

- [automationworld.com](https://www.automationworld.com/supplier-news/news/22485290/comau-llc-comau-selected-to-build-battery-module-production-lines-for-automotive-cells-company-acc), 2022-10-08: "Comau has been selected by Automotive Cells Company (ACC) to design and develop a highly integrated battery module production line for its future Gigafactory."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
