# Keppel reaches FID for 600 MW hydrogen-ready power plant in Singapore

Keppel Infrastructure reached final investment decision to develop a 600MW CCGT power plant in Sakra, Jurong Island, and awarded an EPC contract to a consortium of Mitsubishi Power and Jurong Engineering. The plant will be Singapore's first hydrogen-ready power plant.

- Type: Investment
- Announced: 2022-10-06
- Where: Sakra sector, Jurong Island, Singapore
- Status: announced
- Capacity: 600 MW
- Products: hydrogen-ready CCGT power plant
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Keppel Infrastructure](https://endata.com/companies/64106.md)
- [Mitsubishi Power](https://endata.com/companies/7073.md) (partner)
- [Jurong Engineering Limited](https://endata.com/companies/34224.md) (partner)

## Sources

- [mccoypower.net](https://www.mccoypower.net/post/keppel-to-develop-singapore-s-first-hydrogen-ready-power-plant-with-mitsubishi-power-and-jurong-eng), 2022-10-06: "Keppel Infrastructure has reached final investment decision (FID) to develop a 600MW state-of-the-art, advanced combined cycle gas turbine (CCGT) power plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
