# ORLEN Group to build installation terminal in Świnoujście

The ORLEN Group will construct an installation terminal at the Port of Świnoujście for the Baltic Power offshore wind farm, expected to commence operations in 2025.

- Type: New facility
- Announced: 2022-10-13
- Where: Świnoujście, Poland
- Starts operating: 2025
- Status: announced
- Products: offshore wind farm installation terminal
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Orlen](https://endata.com/companies/25981.md)

## Sources

- [balticwind.eu](https://balticwind.eu/baltic-power-project-driving-new-investments/), 2022-10-13: "Since we launched preparations for our first offshore wind farm project, we have consistently sought to fully tap the potential of Polish economy."
- [windeurope.org](https://windeurope.org/news/hundreds-of-new-jobs-in-offshore-wind-in-poland/), 2022-10-14: "The Polish utility and wind farm developer Orlen will in parallel build an offshore wind installation port nearby in Swinoujscie."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
