# GE secures H-Class gas turbine order from Eneva for Brazil power plant

GE will supply a 7HA.02 gas turbine for Eneva's new Azulão reserve power plant in Brazil, which will deliver up to 350 MW.

- Type: Contract
- Announced: 2022-10-13
- Where: near Manaus, Brazil
- Status: announced
- Capacity: 350 MW
- Products: 7HA.02 gas turbine, H65 generator
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE](https://endata.com/companies/1022.md) (supplier)
- [Eneva](https://endata.com/companies/40846.md) (customer)

## Sources

- [gevernova.com](https://www.gevernova.com/news/press-releases/ge-announces-h-class-gas-turbine-order-from-eneva-to-support-energy-transition-in), 2022-10-13: "Rapid renewable energy growth presents system operators and energy providers with the increasingly difficult task of continuously ensuring stability of the grid and a reliable power supply."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
