# Vestas signs 846 MW wind turbine deal with Engie for Serra de Assuruá

Vestas signed a firm order with Engie for 120 V150-4.5 MW turbines for the 540 MW first phase of the Serra de Assuruá wind farm in Bahia, Brazil, with an option for 68 more turbines for phase two. The project is the largest wind farm in Latin America.

- Type: Contract
- Announced: 2022-10-02
- Where: Gentio do Ouro, Bahia, Brazil, Brazil
- Status: announced
- Capacity: 846 MW
- Products: V150-4.5 MW wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Engie](https://endata.com/companies/999.md) (customer)
- [Vestas](https://endata.com/companies/1364.md) (supplier)

## Sources

- [reve.aeeolica.org](https://reve.aeeolica.org/2022/10/02/vestas-firma-acuerdo-de-846-mw-de-eolica-en-brasil/), 2022-10-02: "Engie firmó un acuerdo con Vestas para el parque eólico Serra de Assuruá en el estado de Bahía, en el municipio de Gentio do Ouro, Brasil."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
