# Vestas to supply turbines for 540MW Phase 1 of Serra de Assuruá wind project in Brazil

Vestas signed a firm order with Engie Brasil Energia to supply 120 V150-4.5MW turbines for the 540MW Phase 1 of the Serra de Assuruá wind park in Bahia, Brazil, including installation, operation, maintenance and a 25-year service agreement.

- Type: Contract
- Announced: 2022-10-03
- Where: Gentio do Ouro, Bahia, Brazil
- Status: announced
- Capacity: 540 MW (Phase 1), 846 MW (total)
- Products: wind turbines, V150-4.5MW turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Vestas](https://endata.com/companies/1364.md) (supplier)
- [ENGIE Brasil Energia](https://endata.com/companies/10893.md) (customer)

## Sources

- [globalenergynetwork.net](https://globalenergynetwork.net/news-item/vestas-to-supply-turbines-for-846mw-serra-de-assurua-wind-project-in-brazil/), 2022-10-03: "Vestas is pleased to work in partnership with ENGIE Brasil Energia and reinforce both companies’ interest in accelerating the energy transition in the country."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
