# EnergoTechService signs RUB 2B investment agreement for Tyumen power equipment plant expansion

Tyumen region and EnergoTechService signed an investment agreement for the second phase of a project to build the Tyumen Power Equipment Plant, with total investments of about 2 billion rubles. The project includes expanding assembly shop space, building a logistics center and training building, and creating over 150 jobs, with completion expected by Q3 2025.

- Type: Expansion
- Announced: 2022-09-21
- Where: Tyumen, Russia, Russia
- Value: $33.0M (2.00B RUB)
- Jobs: 150
- Starts operating: Q3 2025
- Status: announced
- Products: modular mobile power stations, gas piston power stations, gas turbine power stations
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [EnergoTechService](https://endata.com/companies/65428.md)

## Sources

- [t-l.ru](https://t-l.ru/330023.html), 2022-09-21: "The total investment will be about 2 billion rubles, more than 1.5 billion of which will go toward forming a fleet of mobile power equipment."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
